Monday, September 21 and Tuesday, September 22
- Work will include roadway preparation and repair preparation for paving
- All unit owners should plan to enter/exit through the Pheasant Run entrance only. Please limit traffic through the active work areas whenever possible
Thursday, September 24
- Paving of the roadway and all repair areas will take place
- All unit owners, with exception of units 8 Pheasant Run, 10 Pheasant Run and all units on Quail Circle, must use the entrance on Partridge Lane
- Units 8 Pheasant Run, 10 Pheasant Run and all units on Quail Circle may drive through the area during this process, if necessary, but please limit traffic to essential trips only and proceed with caution around the active work area
After Paving
- Once paving is complete, all traffic should enter/exit through the Partridge Lane entrance for at least 24 hours to allow the newly paved surface adequate time to set, with exception of the unit owners listed above
- Those unit owners may use the main entrance; however, we ask that you please limit traffic to essential trips only
We appreciate everyone’s patience and cooperation while this important project is completed. Please be mindful of paving crews, equipment, and changing traffic patterns throughout the project.
Management Committee
Pheasant Ridge Condominium Association