Update – Paving and Catch Basin Cleaning

Paving:

As you are likely aware, paving did not begin last week as planned. More information will be posted on our website when it is available.

Catch Basin Cleaning:

Our vendor is planning to come back on Thursday, November 20th — not Wednesday. The machinery broke and will be repaired on Wednesday.

wet, drain, rain, rainy, nature, drainage, weather, grate, gray rain-3862808.jpg

Catch Basin Cleaning

A drainage company will be on our property on Tuesday and Wednesday, November 18 and 19 to clean the catch basins. The start time is planned to be 7:30am.

The equipment they use for the cleaning may be noisy, so please be aware of this work.

pave, roller, road, equipment, paving, asphalting, asphalt, machinery, steamroller, wheel, steamroller, steamroller, steamroller, steamroller, steamroller-2674054.jpg

Paving

Paving work is scheduled to start Wednesday, November 12th, weather permitting. Additional notices will go out to affected unit owners.

Thank you for your patience with this project.

lighting, beautiful wallpaper, lightbulb, ideas, background, illuminated, iphone wallpaper, black wallpaper, black, light-3489394.jpg

Side Door Light Replacement Project

The Management Committee would like to inform all Pheasant Ridge unit owners that the previously planned project to replace all side-of-the-door lights is set to begin. All replacement fixtures have been purchased, and a qualified electrician has been retained to handle the installation.

The installation process will commence on Saturday morning, November 1, and, weather permitting, is expected to take only one to two days to complete.

Important Information for Unit Owners

  • The light bulb is integrated into the new fixture, so there is no need to replace bulbs separately.
  • The new fixture includes a dusk-to-dawn feature. Unit owners may choose whether or not to enable this option.
  • To use the dusk-to-dawn feature, simply leave the light switch in the ‘on’ position. Note: The ceiling light in the entryway does not offer this feature and will stay on continuously if the switch is left on.
  • If you prefer not to use the dusk-to-dawn function, leave the switch in the ‘off’ position and operate the light as usual. Alternatively, you can insert the provided plastic plug into the top of the outside light to disable the sensor.
  • The old lamp and the empty box for the new fixture will be left at each front door. Please remove the paper instructions and the plastic plug from the box and keep them for your records.
  • It is each unit owner’s responsibility to properly dispose of the old lamp and box.

If you encounter any issues or have questions, please contact the Management Committee via email.

Thank you for your cooperation and patience.

Pheasant Ridge Management Committee

light bulbs, light fixtures, lamps, electricity, energy, bulbs-7162201.jpg

RISE – Standby list for installation of energy-efficiency upgrades

If you are interested in having RISE conduct an energy-efficiency assessment for your unit, RISE has established a waitlist for Pheasant Ridge. Once enough owners express interest, RISE will contact the Management Committee to request approval to move forward with the program.

Please note that any energy assessments or related contracts will be arranged directly between the individual unit owner and RISE.

For more information—

Condominium Projects:
https://www.riseengineering.com/condo-projects

Waitlist for Pheasant Ridge:
https://www.riseengineering.com/condo-projects/pheasant-ridge